how to frame a second floor porch in 90 seconds

'Water on deck!' 'Get out!' — The Navy's official report of the

Aug 17, 2017 The berthing area filled with water in less than 90 seconds, according to spanned the second and third decks below the main, according to the report. at the time of impact and was knocked to the floor by the flood of water. 【Get Price】

The 50 Worst Architecture Fails Complex

Dec 21, 2011 In 1986 a six-story building occupied by a hotel, bank and nightclub crumbled to the ground in under 60 seconds, trapping 50 people While snow-build up was a factor, corrosion caused by inadequate . caused the fourth floor walkway to collapse onto the second floor walkway. Residential Balcony. 【Get Price】

Specification for Deck Boards Timber Decking

Offering independent advice, the Timber Decking and Cladding Association provides information on specification for deck boards, if you are considering the use 【Get Price】

Wood-frame house construction, chapter 3, Framing and closing in

supports the second floor as well via a load-bearing wall extending along In laying out porch steps or approaches to terraces, . provides an additional tie for the framed walls. The sec- ond top plate can be fastened in place when the wall is in . 90. 1 floor. 2. Live and dead loads: floor = 50 Ib/ft2; roof = 50 Ib/ft2. Roof. 【Get Price】

How to Build a Deck That'll Last as Long as Your House Family

Figure A shows the footing locations and framing details for the deck and the privacy fence. Decking: The floor bears the brunt of rot on decks. . Power augers cost about $70 – $90 per day to rent, and they don't always make posthole digging a quick, easy chore. .. It's Like eBay, But Everything Sells in 90 Seconds. 【Get Price】

FRAMING

Never lean an A-frame ladder against anything, always use it fully opened. .. nails driven straight (a 90 degree assembly of the second floor deck, and the deck. Continue with each successive exterior sec- tion around the house. 【Get Price】

Construction, Day 9: Placing Second Floor Beams An Eclectic Mind

Jun 3, 2014 My building will have a second floor over a four-car garage. and doors, and providing the basic framing (but not the floor) for my deck space. Framing between the two big beams really gives the second floor some structure. . 55 seconds ago; First Tries at Bottle Slumping 2 minutes, 21 seconds ago 【Get Price】

Your Pitch, 90 Seconds – Firm Narrative – Medium

Apr 7, 2016 “But I'm having trouble translating that into a quick, compelling story. pitch framework I've been writing about lately to construct an 85-second video. than a sales or investor deck, of course (under 90 seconds is ideal). And for pitches of any length, my approach is to build consensus and clarity around 【Get Price】

Beam Us Up! Harrop House

Mar 26, 2016 The house was built using 'Balloon Framing' which means the The joists that support the second floor were (in the 1890's) simply To remove the interior wall, and open the exterior wall and enclose the screened porch, we needed to have 2 large beams Here's about 3 hours of work in 90 seconds. 【Get Price】

Deck Connection and Fastening Guide - Tulalip Tribes

A system of key connections throughout the deck framing, also known as a continuous load path, is essential to . and flashing not shown for clarity. Floor joist or blocking. 2" nominal deck .. painted and zinc-coated (G90 and ZMAX) connectors. .. Second deck board seconds in order to compare, specify or buy. 【Get Price】

30 SECONDS Outdoor Cleaner, 1 Gallon - Concentrate - Amazon.com

30 SECONDS Outdoor Cleaner cleans stains from Algae, Mold and Mildew; Just spray on and hose off! . Clean patio furniture, flower pots, tables, tombstones, outdoor canvas such as awnings and . or VOCs so that its safe on most all surfaces from the garage floor to the oven. . 30 second cleaner does just what it says! 【Get Price】

Double Decker: A Bi-Level Porch - Popular Mechanics

Dec 31, 2000 It includes four major projects: this massive double decker porch, But the same construction techniques apply if you want to build the porch at grade level. . At this point, you should trim the rafter tails and the second floor 【Get Price】